Royal Park Bridge
West Palm Beach, Florida

A new signature bridge was designed to connect the Florida towns of West Palm Beach and Palm Beach over the Intracoastal Waterway. The four-lane bascule bridge has a total of 9 spans with a maximum span length of 40 m. Ballast Nedam Construction, Inc., the general contractor, was awarded the project in February 2001 based on a precast segmental bridge design.

The bridge was erected using cast-in-place balanced cantilever construction in order to reduce erection time and overall construction schedule.

For balanced cantilever construction the cantilever and continuity tendon required 0.6” diameter 7, 12 and 19 strand tendons. The external tendons used 19 and 22 strand tendons all with 0.6” diameter prestressing steel. VSL recommended the use of solid reusable void forms for the external tendons at the low-point deviators. VSL saved the contractor time and money by recommending reusable deviator voids, “diablos,” which eliminated the need for steel pipe and neoprene duct couplers. The external duct was essentially joint free from anchor to anchor improving the grouting process.

The Royal Park Bridge was designed with the latest FDOT recommendations for durable PT bridges. State of the art technology was used to upgrade the PT system for superior corrosion protection using corrugated plastic duct and encapsulated anchorage hardware. VSL designed new details to allow for inspection of the grout behind the wedge plate. The grouting process was also improved to include VSL high shear mixers, ASBI certified grout personnel and zero bleed grout material.


VSL System Selection Tool

Copyright 2012 VStructural, LLC